WHY NOW

Why act on the PPWR now
and why with a QR code.

The packaging regulation has applied since 12 August 2026. The costliest part of the work is not the paperwork, but a pack that is already printed and has to be reprinted half a year later. Whoever plans the marking of packs now prints it once.

Find out what applies to me What is the PPWR?

The main reason: obligations already apply, and more follow one after another

This is not one obligation with one deadline. The PPWR is phased in, and several steps concern exactly what is visible on the pack. If marking is handled separately each time, a company reprints its packs several times. If it is prepared once and with forethought, most later changes can be made without touching the print.

  1. From 12 Aug 2026Pack identification (type, batch or serial number), manufacturer details, technical documentation and the EU declaration of conformity apply. Generic environmental claims without proof may not be used from 27 Sep 2026.
  2. February 2027Member States are to have penalties in place. From 12 Feb 2027 the symbol of an EPR scheme (for example the Green Dot) may only be shown in a QR code or other digital form.
  3. By the end of 2027Under the GS1 Sunrise 2027 initiative, stores are expected to read 2D codes at the till alongside today's barcode. This is a voluntary industry initiative, not a law.
  4. Earliest 12 Aug 2028A harmonised label showing the material for sorting. Implementing acts from the Commission are awaited.
  5. From 2030Recyclability, recycled content in plastics and less empty space in packaging.

All PPWR deadlines →

Why a QR code instead of more text on the pack

The pack is small, the obligations grow

Not everything fits on a label. A QR code carries only a link; the rest (manufacturer, composition, documents, sorting instructions) is on the page it opens.

Content can be corrected without reprinting

A supplier, a manufacturer's address or a document changes? The details on the page are edited and the printed code stays the same. Text on the pack would mean a new print.

One code for several purposes

A code in the GS1 Digital Link form carries the product number (GTIN) and optionally the batch. It serves the customer, an authority's inspection, the till and the EPR scheme.

The regulation itself does not yet set detailed technical requirements for the QR code, and some markings will only be specified by implementing acts. That is why it makes sense to rely on a code in a standard form and keep the option of changing the content behind it. What stays the same is the link to the pack page. What changes is the information you see on it.

The longer you wait, the more it costs

  • Printing is planned in advance. Labels, printing and boxes are ordered in batches. Stock that is already printed has no marking and later has to be relabelled or scrapped.
  • Supplier documents are not a one-day job. A supplier must provide the information needed to prove conformity, but requesting and checking it takes weeks.
  • Packs change part by part. A bottle, a closure, a label and a carton each have their own material and supplier. Knowing how a pack is made up makes every further obligation quicker to deal with.
  • An inspection can come before the later deadlines. An authority may ask for documentation at any time and the manufacturer provides it within 10 days.

What to do in practice

  1. List your packs and their parts. For each product the material, weight and supplier.
  2. Give each product a code. An EAN (GTIN) or an internal number, so the QR code has something to carry.
  3. Create a public pack page. Manufacturer details, composition and sorting instructions, the same for the customer and the authority.
  4. Print the QR code at a quality that scans at the till. Check the size and quiet zone with a test print.
  5. After that, just add to it. A new document, deadline or requirement goes into the records, not onto the pack.

This is what Info PPWR does: it keeps the records of packs, shows what is missing, issues QR codes in GS1 Digital Link form and displays the public pack page. See the demo here.

Find out what applies to me Create a company account

This explanation is indicative and is not legal advice. The decisive texts are Regulation (EU) 2025/40, its implementing acts and the guidance of the competent authorities. Deadlines that are still being specified may change. Info PPWR does not declare conformity with the PPWR: it helps you keep the data and prepare the documents.